
| Category : | Industrial Plants & Buildings Projects | ||||||
| Project | Owner | Client | Services Provided | Year Completed | |||
| 1. | Conversion of an existing | ExxonMobil | ExxonMobil | Design Review; Government | 2014 | ||
| temporary warehouse building | Approvals; Construction | ||||||
| to permanent warehouse | Inspection | ||||||
| 2. | Warehouse expansion for | Novartis | PM Group | Design Review; Government | 2014 | ||
| Novartis | Approvals; Construction | ||||||
| Inspection | |||||||
| 3. | West Coast Ferry Terminal – | Shell | CB&I / | Design; Government | 2008 | ||
| Temporary facilities for ECC | Scan-Bilt | Approvals; Construction | |||||
| Inspection | |||||||
| 4. | Steel Platform at Pulau Seraya | PowerSeraya | Kosui | Design; Government | 2006 | ||
| Approvals; Construction | |||||||
| Inspection | |||||||
| 5. | A & A to Fire Chemical | Alteco | Alteco | Design Review; Government | 2008 | ||
| Plant | Approvals; Construction | ||||||
| Inspection | |||||||
| 6. | Container Berth & Stacking | PSA | Toa | PE services for piling works, | 2008 | ||
| Yard at Pasir Panjang | Corporation | temporary works & | |||||
| Terminal | permitting | ||||||
| 7. | 30mgd Seawater Desalination | SingSpring | Loh & Loh | Re-engineering for | 2004 | ||
| Plant at Tuas South Ave 1 | Construction | Structural Optimization | |||||
| (Hyflux Hydrochem) | |||||||
| 8. | Orimulsion Project (Land) | Power Seraya | IHI Japan | Design; Government | 2006 | ||
| at Jurong Island | Approvals; Construction | ||||||
| Inspection | |||||||
| 9. | Access Stairway at existing | Eastman | Technip- | Design; Government | 2003 | ||
| OXO Plant | Chemical | Coflexip | Approvals; Construction | ||||
| Inspection | |||||||
| 10. | Singapore Combined Cycle | Tuas Power | Mitsubishi | Design Review; Government | 2005 | ||
| Power Plant at Tuas | Corporation | Approvals; Construction | |||||
| Inspection | |||||||
| 11. | Additions & Alterations to | Adampark & | Kunyi (S) | Design; Government | 2002 | ||
| Existing 2-storey Factory | Print Pte Ltd | Approvals; Construction | |||||
| at No. 6 Loyang Way 4 | Inspection | ||||||
| 12. | Additions & Alterations (Truck | Oiltanking | Oiltanking | Government | 2002 | ||
| Loading Bay & Ancillary Facilities) | Singapore | Singapore | Submission | ||||
| to existing Chemical Storage | Chemical Storage | Chemical Storage | |||||
| Terminal at Seraya Ave | |||||||
| 13. | Temporary MBS 3 site | Mitsui Bisphenol | Leads | Design Review | 2001 | ||
| offices and Ancillary | Singapore | Engineering | |||||
| Facilities at Pulau Sakra | |||||||
| 14. | Additional of a 12″ and 2 | Petrochemical | CBI Overseas, | Piperack Evaluation | 2001 | ||
| nos. 6″ pipelines at PCS | Corporation of | LLC | |||||
| existing piperack | Singapore | ||||||
| 15. | Integrated Maintenance | Rotary IMC | Rotary IMC | Full Consultancy | 2001 | ||
| Centre | Pte Ltd | Pte Ltd | |||||
| 16. | Sewerage Treatment Plant | Ministry of the | Loh & Loh | Civil / Structural Design; | 2000 | ||
| No. 2 on Jurong Island | Environment – | Construction | Government Approvals | ||||
| Sewerage Dept. | |||||||
| 17. | Proposed Mainland Ferry | Lands & Estates | Loh & Loh | Full Consultancy | 1998 | ||
| Terminal at Nicoll Drive | Organisation | Construction | |||||
| 18. | Electrical substation | Van Ommeren | Rotary | Full Consultancy | 1998 | ||
| Engineering | |||||||
| 19. | Design for Singapore Distribution | Air Products | Loh & Loh | Tender Design | 1997 | ||
| Centre | Pte Ltd | Construction | |||||
| 20. | Batam Slipway and Workshop | Loh & Loh | PT Loh & Loh | Equipment & Workshop | 1997 | ||
| Construction | Construction | Foundation Design only | |||||
| Indonesia | |||||||
| 21. | Machining & Die-Casting | PT Timor | Audex | Civil / Structural Design | 1997 | ||
| Shop at West Java | Industri Komponen | ||||||
| 22. | Press Shop at West Java | PT Timor | Audex | Civil / Structural Design | 1997 | ||
| Industri Komponen | |||||||
| 23. | Additions & Alterations to | Oiltanking | Rotary | Full Services | 1997 | ||
| Existing Power Station at | Singapore | Engineering | |||||
| Pulau Seraya | |||||||
| 24. | Fish Market Complex at | Public Works | Loh & Loh | Alternative Design | 1997 | ||
| Senoko | Department | Construction | |||||
| 25. | Contractor’s Yard at Off | Mobil Oil | Sennett Civil & | Design; Government | 1997 | ||
| Tg. Kling | General Contr. | Submission; Construction | |||||
| Inspection | |||||||
| 26. | Bus Assembly Factory | Sinbus | Sinbus | Layout Planning & | 1997 | ||
| (Ho Chee Minh City) | Engineering | Engineering | Preliminary Design | ||||
| Pte Ltd | Pte Ltd | ||||||
| 27. | Chugoku Paint Varnish Plant | Chugoku Marine | Chiyoda | Full Services | 1997 | ||
| Paints Pte Ltd | Singapore | ||||||
| 28. | Proposed 6.6KV/LV Substation | Jurong Town | Penta Ocean | Design; Government | 1996 | ||
| at Pulau Damar Laut | Corporation | Approvals; Construction | |||||
| Inspection | |||||||
| 29. | Senoko Gasworks Development | PUB (Gas) | Mitsui | Design Review; Government | 1996 | ||
| Engineering | Approvals; Construction | ||||||
| Inspection | |||||||
| 30. | Factory and Office Complex, | Rotary | Rotary | Full Consultancy | 1993 | ||
| Tuas Avenue 20 | Engineering | Engineering | |||||
| 31. | 3 Nos. Transformer Oil | NI Transformer | NI Transformer | Full Consultancy | 1992 | ||
| Storage Tanks and Ancillaries | |||||||
| 32. | 3-storey Warehouse, | King Spice | King Spice | Full Consultancy | 1992 | ||
| Toh Guan Road, S’pore | Investments | Investments | |||||
| 33. | Cofferdam for Sewer | Ministry of the | Julian | Full Consultancy | 1991 | ||
| Flow Diversion Scheme | Environment | Construction | |||||
| 34. | Paint Factory Complex | Chugoku | Penta Ocean | Full Consultancy | 1992 | ||
| at Johore Port | Paint (M) | Paint (M) | 1994* | ||||
| 35. | Additions & Alterations to | Harris | Harris | Full Consultancy | 1992 | ||
| Office Laboratory & | Semiconductor | Semiconductor | |||||
| Light Workshop Areas | |||||||
| 36. | Cellular Mobil Telephone | Singapore | C.Itoh/NESIC | Full Consultancy | On-going | ||
| System – Antennae | Telecoms | from 1990 | |||||
| * | Warehouse Extension | ||||||

Orimulsion Project

| Category : | Marine Facilities | ||||||
| Project | Owner | Client | Services Provided | Year Completed | |||
| 1. | Jetty 12 – Piperacks extension | Oiltanking | Oiltanking | QP – Design, Construction | 2014 | ||
| tier | & Government Approvals | ||||||
| Services | |||||||
| 2. | Modifications to existing | Oiltanking | Oiltanking | QP – Design, Construction | 2014 | ||
| Oiltanking Jetty piperacks for | & Government Approvals | ||||||
| Vitol Upgrade Project | Services | ||||||
| 3. | Construction of container berths | PSA | Penta-Ocean/ | QP – Construction Services | 2014 | ||
| P31-P33 and stacking yards at | Hyundai/Koon JV | ||||||
| Pasir Panjang Terminal, Phase III | |||||||
| 4. | Protection Bund Wall and | Jurong Corporation | Toa Corporation | QP – Design, Construction | 2014 | ||
| Relocation of Solids Handling | & Government Approvals | ||||||
| Pier at Ayer Chawan Basin | Services | ||||||
| 5. | Jurong Aromatics Complex | JAC | ESSAR | QP – Design, Construction | 2016 | ||
| (OSBL, ICP & Jetty) | & Government Approvals | ||||||
| Services | |||||||
| 6. | Construction of container | PSA | Toa Corporation | QP – Construction Services | 2011 | ||
| berths & stacking yards on | |||||||
| Jurong Island | |||||||
| 7. | Vopak – Jetty 5 | Vopak | McConnell | Design Engineering | 2008 | ||
| Dowell | |||||||
| 8. | Tekong Reclamation – Eastern | HDB / Surbana | Toa-JDN (PUT) | PE – Design, Construction | 2011 | ||
| Profile of Area D | Joint Venture | & Government Approvals | |||||
| Services | |||||||
| 9. | ECC – Temporary Mainland | Shell | CB&I | QP – Design, Construction | 2008 | ||
| Ferry Terminal at West Coast | & Government Approvals | ||||||
| Services | |||||||
| 10. | ECC – Permanent Marine | Shell | CB&I | QP – Design, Construction | 2008 | ||
| Facilities (Unloading Quay) | & Government Approvals | ||||||
| Services | |||||||
| 11. | ECC – Temporary Marine | Shell | CB&I | QP – Design, Construction | 2008 | ||
| Facilities (Passenger | & Government Approvals | ||||||
| Pontoon & Ro-Ro Ramp) | Services | ||||||
| 12. | PT SMOE Batam Yard | PT SMOE | Loh & Loh | Design / Value | 2006 | ||
| Construction | Engineering | ||||||
| 13. | Vopak Finger Jetties | Vopak | McConnell | Design | 2006 | ||
| at Jurong Island | Dowell | ||||||
| 14. | Jetty 2A at Jurong Island | Oiltanking | Oiltanking | QP – Design, Construction | 2005 | ||
| & Government Approvals | |||||||
| Services | |||||||
| 15. | Orimulsion Project (Marine) | Power Seraya | IHI Japan | QP – Design, Construction | 2006 | ||
| at Jurong Island | & Government Approvals | ||||||
| Services | |||||||
| 16. | Fish Farm off St. John’s Island | Agri-Food & Vet | Datawin | Design | 2003 | ||
| Authority | Enterprises | ||||||
| 17. | PUT Land Reclamation Project | Housing & | Toa Corporation | Temporary works design | 2001 | ||
| Development | |||||||
| Board | |||||||
| 18. | Temporary Site Facilities for | Housing & | Toa Corporation | Full Consultancy | 2001 | ||
| Pulau Ubin and Tekong | Development | ||||||
| Reclamation Project | Board | ||||||
| 19. | Staging Ground at Changi | Housing & | Toa Corporation | Full Consultancy | 2001 | ||
| East for Pulau Ubin and | Development | ||||||
| Tekong Reclamation Project | Board | ||||||
| 20. | Chemical Jetties (J11 & J12) | Oiltanking | Oiltanking | QP – Design, Construction | 2002 | ||
| at Pulau Seraya | Singapore | Singapore | & Government Approvals | ||||
| Chemical Storage | Chemical Storage | Services | |||||
| 21. | Marine Loading / Unloading | Exxon Chemical | Toa Corporation | QP – Design, Construction | 2000 | ||
| Jetty Facilities for SOP on | & Government Approvals | ||||||
| Pulau Ayer Chawan | Services | ||||||
| 22. | Construction of Berth J24 and | JTC | Daewoo Corp.- | Alternative design; | 2000 | ||
| 25 on Foreshore and seabed | Loh & Loh J.V. | Temporary works design; | |||||
| at Pulau Damar Laut | Rectification works design | ||||||
| 23. | Feasibility study for submarine | Tankstore | Tankstore | Preliminary design, order of | 1999 | ||
| pipelines from P. Busing to | cost estimate and MPA & | ||||||
| Jurong Island | Land Office approval | ||||||
| 24. | Marine Facilities for SOP on | Exxon | Kellogg-Chiyoda | QP – Design, Construction | 2000 | ||
| Pulau Ayer Chawan | Chemical | & Government Approvals | |||||
| Services | |||||||
| 25. | Temporary Marine Landings | Exxon | Toa Corporation | Professional Engineering | 1999 | ||
| and Ramps for SCC Project | Chemical | Consultancy services | |||||
| 26. | North Eastern Reclamation | Housing & | Toa Corporation – | PE – Design, Construction | 2001 | ||
| Phase 4 – Area at Punggol | Development | JDN J.V. | & Government Approvals | ||||
| and Coney Island | Board | Services | |||||
| 27. | Tanker Jetty No. 5, P. Sebarok | Penta Ocean | Penta Ocean | Temporary works design | 1997 | ||
| (Engineering Design) | |||||||
| 28. | Thivai Tanker Jetty | Saigon Petroleum | Ng Huat | Tender Design only | Not Available | ||
| Construction | |||||||
| 29. | Jetty 5 – (Topside) | Van Ommeren | Chiyoda | QP – Design, Construction | 1997 | ||
| Singapore | & Government Approvals | ||||||
| Services | |||||||
| 30. | Jetty @ Senoko | Public | Mitsui | Tender Design | Not Available | ||
| Utilities Board | Engineering | ||||||
| 31. | Chemical Jetty, Water | Seraya | Penta Ocean | Government Approvals | 1997 | ||
| Intake, Water Outfall | Chemicals | ||||||
| 32. | Ro-Ro Ramps, Personnel | Seraya | Penta Ocean | Full Consultancy | 1995 | ||
| Jetty, Barge Quay | Chemicals | ||||||
| 33. | Technical feasibility study | Caltex (S) Pte Ltd | Caltex (S) Pte Ltd | Feasibility Study | 1995 | ||
| to replace existing submarine | |||||||
| pipelines with pipelines on | |||||||
| existing trestle for Caltex’s | |||||||
| jetties 1, 2, 4, 5, 6 & 7 | |||||||
| 34. | Technical feasibility study | Esso S’pore | Esso S’pore | Design Services | 1994 | ||
| on upgrading Bulk Barge | |||||||
| Pier, Shipyard Road | |||||||
| 35. | Tanker Jetty 6, P. Seraya | Oiltanking | Oiltanking | Full Consultancy | 1995 | ||
| 36. | Technical study for Gangways | Caltex (S) Pte Ltd | Caltex (S) Pte Ltd | Design Services | 1994 | ||
| for Jetties 3, 4, 6 & 7 | |||||||
| 37. | Vehicle Barge Ramp, | Petrochemical | Petrochemical | Full Consultancy | 1994 | ||
| Tg. Penjuru | Corp. of S’pore | Corp. of S’pore | |||||
| 38. | 5000 DWT Tanker Berth & | Petrochemical | Petrochemical | Full Consultancy | 1994 | ||
| Vehicle Barge Ramp, P. | Corp. of S’pore | Corp. of S’pore | |||||
| Ayer Merbau | |||||||
| 39. | Passenger Jetty & Vehicle | Petrochemical | Petrochemical | Full Consultancy | 1994 | ||
| Barge Ramp, P. Ayer Merbau | Corp. of S’pore | Corp. of S’pore | |||||
| 40. | Erection of 230 ton | Mobil Oil | Rotary | Design and site supervision | 1992 | ||
| Prefabricated Hose Rack | Engineering | of erection method and | |||||
| rigging arrangement | |||||||
| 41. | Repair to damaged Quay | Public | Oiltanking | Full Consultancy | 1993 | ||
| Utilities Board | |||||||
| 42. | Tanker Jetty 5, | Tankstore | Tankstore | QP – Design, Construction | July 1993 | ||
| P. Busing | & Government Approvals | ||||||
| Services | |||||||
| 43. | Tanker Jetty 2, Tg. Penjuru | Caltex (S) Pte Ltd | Caltex (S) Pte Ltd | Full Consultancy | 1993 | ||
| 44. | Improvements to Approachway | Oiltanking | Oiltanking | Full Consultancy | 1992 | ||
| to Tanker Jetties MJ2 and | |||||||
| MJ4, P. Seraya (Dredging) | |||||||
| 45. | LPG Jetty (3 Berths) at | Petrochemical | Penta Ocean | Planning, preliminary | 1991 | ||
| P. Seraya | Corp. of S’pore | investigation & designing for | |||||
| feasibility study | |||||||
| 46. | Temporary Works for Subsea | Mobil Oil | Toa Corporation | Alternative Design | 1991 | ||
| Pipelaying and Modifications to | |||||||
| Marine Trestle, Berth 1 & Berth 4 | |||||||
| 47. | Lube Jetty at Seduan, | Petronas | Tenaga Ewbank | Planning design & drafting | 1991 | ||
| Sibu, Malaysia | Dagangan | Preece | |||||
| 48. | Tanker Jetties for | Petronas | Penta Ocean | Tender alternative design | 1991 | ||
| Melaka Refinery | |||||||
| 49. | Repairs to Berths 1, 4 | Mobil Oil | Presscrete | Design of repair works; | 1990 | ||
| & Pesek Jetty | Engineering | Technical inspections | |||||
| 50. | Tanker Jetty for | Shell Eastern | Penta Ocean | Alternative designs of | 1991 | ||
| Pandan Installation | structure (partial) | ||||||
| 51. | Tanker Jetties 4 and 5 | Oiltanking | Oiltanking | Full Consultancy | 1991 | ||
| at P. Seraya | |||||||

Extension of Approach Trestle and addition of Petroleum Jetty for vessels up to 160,000 DWT

Deep water Chemical & Petroleum Jetty for vessels of 1,000 DWT to 120,000 DWT

1 km long electric power cable bridge (right) with 12m low spans and 2 x 50m high spans

Feasibility study on Bulk Liquid Storage Terminal

| Category : | Petrochemical & Refinery Plants Projects | ||||||
| Project | Owner | Client | Services Provided | Year Completed | |||
| 1. | Aurora / EOS – QP Consulting | ExxonMobil | ExxonMobil | Planning application | 2015 | ||
| for Planning | |||||||
| 2. | Addition of pipelines from OOTS | Oiltanking | Oiltanking | Design Review; Government | 2014 | ||
| to PCS & M/s Lanxess | Odfjell | Odfjell | Approvals; Construction | ||||
| Inspection | |||||||
| 3. | Jurong Aromatics Complex | JAC | SK | Design Review; Government | 2016 | ||
| (ISBL) | Engineering | Approvals; Construction | |||||
| Inspection | |||||||
| 4. | Cumene2/OSBL Main Utility | Chang Chun | Fu-Tai | Design Review; Government | 2013 | ||
| Facilities; VAM Plant & AAL | Group | Engineering | Approvals; Construction | ||||
| Plant | Inspection | ||||||
| 5. | Q-Chem II Revamp | Oiltanking | Oiltanking | Design Review; Government | 2011 | ||
| Odfjell | Odfjell | Approvals; Construction | |||||
| Inspection | |||||||
| 6. | EM SPT SOP2 – Temporary | ExxonMobil | LBG-NGT Corp | Design | 2009 | ||
| facilities | |||||||
| 7. | Chem 6 | Oiltanking | Oiltanking | Design Review; Government | 2009 | ||
| Odfjell | Odfjell | Approvals; Construction | |||||
| Inspection | |||||||
| 8. | EM SPT – SOP2 Olefins | ExxonMobil | Shaw Stone & | Design Review; Government | 2013 | ||
| Recovery Project | Webster | Approvals; Construction | |||||
| Inspection | |||||||
| 9. | Chem 5 / PO & Matrix | Oiltanking | Oiltanking | Review and Government | 2009 | ||
| Storage Terminal Project | Odfjell | Odfjell | Permitting Licencing | ||||
| Application to FSSD | |||||||
| 10. | EM SPT – A&A works at | ExxonMobil | Foster Wheeler | Design Review; Government | 2009 | ||
| ACB, SOP & SAR | Approvals; Construction | ||||||
| Inspection | |||||||
| 11. | EM SPT – Government | ExxonMobil | Foster Wheeler | Design Review; Government | 2009 | ||
| Permitting (Main) | Approvals; Construction | ||||||
| Inspection | |||||||
| 12. | ExxonMobil Turn-Around | ExxonMobil | CBI | Design Review; Government | 2006 | ||
| Approvals; Construction | |||||||
| Inspection | |||||||
| 13. | Additions of ancillary buildings | ExxonMobil | ExxonMobil | Full Consultancy | 2004 | ||
| within existing Singapore | |||||||
| Chemical Plant at PAC | |||||||
| 14. | Chem 3 & Chem 4 and related | Oiltanking | Oiltanking | Design Review; Government | 2003 | ||
| facilities at Pulau Seraya | Odfjell | Odfjell | Approvals; Construction | ||||
| Inspection | |||||||
| 15. | Addition of Ancillary Facilities | Oiltanking | Rotary | Government Submission | 2002 | ||
| (Carbon Adsorber) at TF80 | Singapore | Engineering | |||||
| at Pulau Seraya | Chemical Storage | ||||||
| 16. | Addition of Pipebridge and | Oiltanking | Rotary | Government Submission | 2002 | ||
| Ancillary Facilities to existing | Singapore | Engineering | |||||
| Chemical Storage Terminal | Chemical Storage | ||||||
| at Pulau Seraya | |||||||
| 17. | Site Integration Project | ExxonMobil | Foster Wheeler | Design Review; Government | 2002 | ||
| Asia Pacific | Approvals; Construction | ||||||
| Inspection | |||||||
| 18. | Repair and Erection of | ExxonMobil | Kellogg- | Design Review; Government | 2001 | ||
| Equipment, Piperacks and | Chiyoda | Approvals; Construction | |||||
| other Ancillaries at Existing | Inspection | ||||||
| Singapore Chemical | |||||||
| Complex at Pulau Ayer | |||||||
| Chawan | |||||||
| 19. | Addition of Piperacks & | Seraya Chemicals | Audex | Design Review; Government | 2001 | ||
| other Ancillaries to existing | Singapore | Pte Ltd | Approvals; Construction | ||||
| Refinery at Pulau Seraya | Inspection | ||||||
| 20. | Addition of Piperacks & | Seraya Chemicals | Oiltanking | Design Review; Government | 2002 | ||
| Ancillary Facilities to existing | Singapore | Singapore | Approvals; Construction | ||||
| Seraya Petrochemical | Chemical Storage | Inspection | |||||
| Complex at Pulau Seraya | |||||||
| 21. | Addition of equipment and | Petrochemical | CBI Overseas, | Full Consultancy | 2001 | ||
| structure and storage tank | Corporation of | LLC | |||||
| to existing PCS II Ethylene | Singapore | ||||||
| Plant at Pulau Ayer Merbau | |||||||
| 22. | Steel Vertical & Horizontal | Oiltanking S’pore | Oiltanking S’pore | Design Review; Government | 2002 | ||
| Storage tanks, Pipebridges, | Chemical Storage | Chemical Storage | Approvals; Construction | ||||
| Piperacks & Ancillary Facilities | Pte Ltd | Pte Ltd | Inspection | ||||
| at Pulau Seraya | |||||||
| 23. | Additions of 1 no. of Steel | Vopak Terminals | Chiyoda | Design Review; Government | 2000 | ||
| Storage Tank (TK-0909) and | Singapore | Approvals; Construction | |||||
| Ancillary Facilities on Jurong | Inspection | ||||||
| Island | |||||||
| 24. | Additions of Truck Loading Bay | Vopak Terminals | Rotary | Design Review; Government | 2000 | ||
| to existing Terminal at Pulau | Engineering | Approvals; Construction | |||||
| Sakra | Inspection | ||||||
| 25. | Additions of 6 nos. of Steel | Vopak Terminals | Rotary | Design Review; Government | 2000 | ||
| Storage Tanks, Piperacks, | Engineering | Approvals; Construction | |||||
| Pipebridges, and other | Inspection | ||||||
| Ancillary Facilities (Pit 1) | |||||||
| on Jurong Island | |||||||
| 26. | Chemical Storage Terminal | Van Ommeren | Chiyoda | Design Review; Government | 1999 | ||
| (Celanese AA/AE Storage | Singapore | Approvals; Construction | |||||
| Facilities) | Inspection | ||||||
| 27. | Singapore Acetyls Project | Celanese | Celanese | Design Review; Government | 2000 | ||
| Singapore | Singapore | Approvals; Construction | |||||
| Inspection | |||||||
| 28. | Chemical Storage Terminal | Van Ommeren | Rotary | Design Review; Government | 1999 | ||
| (MBS Storage Facilities) | Engineering | Approvals; Construction | |||||
| Inspection | |||||||
| 29. | Singapore Olefins Plant on | Exxon Chemical | Kellogg-Chiyoda | Design Review; Government | 2001 | ||
| Jurong Island | Approvals; Construction | ||||||
| Inspection | |||||||
| 30. | TITAN/LDPE Project | Titan Polyethylene | Mitsui | Civil / Structural Design | 1999 | ||
| (Malaysia) | Engineering | (US$20m) | |||||
| 31. | Chemical Storage Terminal | Van Ommeren | Rotary | Design Review; Government | 1998 | ||
| (NSC/Lonza Storage Facilities) | Engineering | Approvals; Construction | |||||
| Inspection | |||||||
| 32. | Chemical Storage Terminal | Van Ommeren | Rotary | Design; Government | 1998 | ||
| (SMAG Storage Facilities) | Engineering | Approvals; Construction | |||||
| Inspection | |||||||
| 33. | 4 Nos. Storage Tanks at | Van Ommeren | Rotary | Design Review; Government | 1997 | ||
| Pulau Sakra | Engineering | Approvals; Construction | |||||
| Inspection | |||||||
| 34. | Singapore Manufacturing Plant | Chevron Chemical | Chiyoda | Design Review; Government | 1998 | ||
| Singapore | Approvals; Construction | ||||||
| Inspection | |||||||
| 35. | Additions & Alterations to | Exxon Chemical | S’pore Aromatics | Design; Government | 1996 | ||
| Central Building at P. Ayer Chawan | Approvals; Construction | ||||||
| Inspection | |||||||
| 36. | Control Building including | Singapore | Singapore | Full Consultancy | 1996 | ||
| workshops, administration & | Aromatics | Aromatics | |||||
| warehousing for Paraxylene / | Company | Company | |||||
| Benzene Plant | |||||||
| 37. | Chemical Storage Terminal, | Van Ommeren | Van Ommeren | Full Consultancy for | 1993 | ||
| P. Sakra, Buildings & | Buildings & Civil works; | ||||||
| Tankfarms | Government Approvals | ||||||
| 38. | Offsite Piperacks for | Mobil Oil | Mobil Oil | Full Consultancy | 1992 | ||
| CCR/Aromatics Plant | |||||||
| 1. | Modifications to existing Chem 6 | Oiltanking | Oiltanking | Design Review; Government | 2016 | ||
| storage tanks T-8709 & T-8713 | Odfjell | Odfjell | Approvals; Construction | ||||
| Inspection | |||||||
| 2. | Project Silver – Pandan Terminal | Shell Eastern | Shell Eastern | Design Review; Government | 2015 | ||
| Approvals; Construction | |||||||
| Inspection | |||||||
| 3. | Mogas Efficiency Project – | Oiltanking | Oiltanking | Design Review; Government | 2015 | ||
| Conversion of existing Boiler | Approvals; Construction | ||||||
| House into Substation at | Inspection | ||||||
| Jurong Island | |||||||
| 4. | ECC Debottlenecking and | Shell Eastern | Toyo | Design Review; Government | 2015 | ||
| Flare Revamp Projects | Engineering | Approvals; Construction | |||||
| Inspection | |||||||
| 5. | Sphere Tankfarm and related | Oiltanking | Oiltanking | Design Review; Government | 2014 | ||
| facilities | Odfjell | Odfjell | Approvals; Construction | ||||
| Inspection | |||||||
| 6. | CARADOL Projects | Oiltanking | Oiltanking | Design Review; Government | 2014 | ||
| Odfjell | Odfjell | Approvals; Construction | |||||
| Inspection | |||||||
| 7. | Benzene System Modification | Oiltanking | Oiltanking | Design Review; Government | 2010 | ||
| Odfjell | Odfjell | Approvals; Construction | |||||
| Inspection | |||||||
| 8. | Propylene system modification | Oiltanking | Oiltanking | Design Review; Government | 2010 | ||
| at TF83 at Jurong Island | Odfjell | Odfjell | Approvals; Construction | ||||
| Inspection | |||||||
| 9. | Phase 10 – Petroleum Storage | Oiltanking | Oiltanking | Design Review; Government | 2011 | ||
| Terminal at Jurong Island | Approvals; Construction | ||||||
| Inspection | |||||||
| 10. | A&A to existing Invista Adipic | Invista | CBI | Design Review; Government | 2009 | ||
| site involving erection of 1 no. | Approvals; Construction | ||||||
| Ammonia Storage Tank & | Inspection | ||||||
| ancillary facilities at 1 Sakra Ave | |||||||
| 11. | Ethylene Cracker Complex at | Shell Eastern | CB&I | Design Review; Government | 2010 | ||
| Pulau Ular | Approvals; Construction | ||||||
| Inspection | |||||||
| 12. | Pits 11 & 5 at Pulau | Vopak | Chiyoda | Design Review; Government | 2008 | ||
| Sebarok | Approvals; Construction | ||||||
| Inspection | |||||||
| 13. | Bukom Refinery Modification | Shell Eastern | FWAP | Design Review; Government | 2010 | ||
| at Pulau Bukom | Approvals; Construction | ||||||
| Inspection | |||||||
| 14. | Temporary earthworks for | Vopak | Toh Teck Seng | Design; Government | 2007 | ||
| Proposed Pit 11 & Extension | Approvals; Construction | ||||||
| of Pit 5 at Pulau Sebarok | Inspection | ||||||
| 15. | Upgrade Existing 1 no. | ExxonMobil | ExxonMobil | Design Review; Government | 2007 | ||
| Class 3 Storage Tank to | Approvals; Construction | ||||||
| Class 1 at SCC | Inspection | ||||||
| 16. | EM SPT – Temporary Facilities | ExxonMobil | FWP | Design Review; Government | 2008 | ||
| for Area 17 | Approvals; Construction | ||||||
| Inspection | |||||||
| 17. | EM SPT – Government | ExxonMobil | FWP | Design Review; Government | 2006 | ||
| Permitting (Temporary | Approvals; Construction | ||||||
| Services) | Inspection | ||||||
| 18. | Pit 11 & extension of Existing | Vopak | Vopak | Design Review; Government | 2006 | ||
| Pit 5 for Class III Petroleum | Approvals; Construction | ||||||
| Storage & related facilities at | Inspection | ||||||
| Pulau Sebarok | |||||||
| 19. | ITT Pipelines from OTS Terminal | Oiltanking | Oiltanking | Design Review; Government | 2007 | ||
| to Phase 6 | Approvals; Construction | ||||||
| Inspection | |||||||
| 20. | Phase 7 – Petroleum Storage | Oiltanking | Oiltanking | Design Review; Government | 2008 | ||
| Terminal at Jurong Island | Approvals; Construction | ||||||
| Inspection | |||||||
| 21. | Phase 6 – Petroleum Storage | Oiltanking | Oiltanking | Design Review; Government | 2008 | ||
| Terminal at Jurong Island | Approvals; Construction | ||||||
| Inspection | |||||||
| 22. | 2 nos. Heat Exchangers at | ExxonMobil | ExxonMobil | Design; Government | 2004 | ||
| existing SPA Plant | Approvals | ||||||
| 23. | SPO Yard Expansion Project | ExxonMobil | ExxonMobil | Full Consultancy | 2003 | ||
| at SCP on Jurong Island | |||||||
| 24. | SCP Laboratory Store/Sample | ExxonMobil | ExxonMobil | Design | 2003 | ||
| Retention Annex | |||||||
| 25. | Pit 10 at Pulau Sebarok | Vopak Terminals | Chiyoda | Government Approvals | 2003 | ||
| Singapore | |||||||
| 26. | 3 nos. of Holding Tank | Croda | Audex | Design Review; Government | 2001 | ||
| Singapore | Pte Ltd | Approvals; Construction | |||||
| Inspection | |||||||
| 27. | Addition of Piperacks, | Oiltanking | Audex | Design Review; Government | 2001 | ||
| Pipebridges & other Ancillaries | Singapore | Pte Ltd | Approvals; Construction | ||||
| to existing Oil Storage | Inspection | ||||||
| Terminal at Pulau Seraya | |||||||
| 28. | Additions of 6 nos. of Steel | Vopak Terminals | Sumitomo | Full Consultancy | 2001 | ||
| Storage Tanks, Piperacks, | Chemical | ||||||
| Pipebridges, and other | Engineering | ||||||
| Ancillary Facilities on Jurong | |||||||
| Island | |||||||
| 29. | Control Building at JINEX PIB | Jinzhou Jinex | JGC | Specialist Design | 1999 | ||
| Project | Lubricant | Singapore | |||||
| (Jinzhou – China) | Additives Co. Ltd | ||||||
| 30. | 4 Storage Tanks at Pulau | Shell Eastern | CBI Overseas | Design Review; Government | 2000 | ||
| Bukom | Approvals; Construction | ||||||
| Inspection | |||||||
| 31. | Lube Oil Plant at Turkmenbashi | Ministry of Oil | Edeleanu | Design of Civil works | 2000 | ||
| Refinery, Turkmenistan | & Gas Industries | (S$5m) | |||||
| and Resources | |||||||
| of Turkmenistan | |||||||
| 32. | Condensate Splitter Unit | Chiyoda | Shell Eastern | Design Review; Government | 2000 | ||
| Project on Pulau Bukom | Corporation | Approvals; Construction | |||||
| Inspection | |||||||
| 33. | Additions & Alterations to | Singaport | Singaport | Full Consultancy | 1999 | ||
| Existing Slop Reception | Cleanseas | Cleanseas | |||||
| Centre | |||||||
| 34. | Zhuhai Terminal (VOPAK) | Van Ommeren / | Van Ommeren / | Specialist advice | 1997 | ||
| Paktank | Paktank | ||||||
| 35. | Oil Drainage System (SEPL) | Shell Eastern | Stork Comprimo | Feasibility Study | 1996 | ||
| Pit 43 (Feasibility Study) | Petroleum | ||||||
| 36. | Iso-Pentane (Planning Approval | Mobil Oil | Chiyoda | Design; Government | 1996 | ||
| only) | Singapore | Approvals; Construction | |||||
| Inspection | |||||||
| 37. | Additions of CCR Booster | Mobil Oil | Foster Wheeler | } | } | ||
| Compressor; | } Design Review; | } | |||||
| Existing Refinery Heater / | Mobil Oil | Mobil Oil | } Government Approvals; | } 1997 | |||
| Exchanger & | } Construction Inspection | } | |||||
| Fin Fan Cooler / Exchanger | Mobil Oil | Mobil Oil | } | } | |||
| 38. | Structural Repair to Existing | Mobil Oil | Mobil Oil | Design; Construction | 1997 | ||
| Refinery Structures | Inspection | ||||||
| 39. | Solvent Debottlenecking at | Esso | Edeleanu Asia | Design; Government | 1997 | ||
| Pulau Ayer Chawan | S’pore | Approvals; Construction | |||||
| Inspection | |||||||
| 40. | Additions & Alterations to | Elf Atochem | Foster Wheeler | Design Review; Government | 1997 | ||
| Existing Compounding Plant | (S.E.A) | Eastern | Approvals; Construction | ||||
| Inspection | |||||||
| 41. | Blast Resistant Wall | Esso | Esso | Design; Construction | 1996 | ||
| S’pore | S’pore | Inspection | |||||
| 42. | Additions & Alterations to | Mobil Oil | Mobil Oil | Design; Government | 1997 | ||
| Existing Maintenance Workshop | Approvals; Construction | ||||||
| & Fire House | Inspection | ||||||
| 43. | LRCC Unit Revamp & | Shell Eastern | Chiyoda | Design Review; Government | 1997 | ||
| Performance Enhancement | Petroleum | Singapore | Approvals; Construction | ||||
| Inspection | |||||||
| 44. | Improvements to Fire Fighting | Caltex (S) Pte Ltd | Caltex (S) Pte Ltd | Design; Construction | 1996 | ||
| System | Inspection | ||||||
| 45. | Pump floor Extension, Analyser | Shell Eastern | Shell Eastern | Full Services | 1997 | ||
| House, etc | Petroleum | Petroleum | |||||
| 46. | Pit 8 & 9 at Pulau Sebarok | Van Ommeren | Chiyoda | Full Services | 1997 | ||
| Singapore | |||||||
| 47. | 17.2m Spherical Tank at | Mobil Oil | Toyo Kanetsu | Design; Government | 1996 | ||
| Pulau Pesek | K.K | Approvals; Construction | |||||
| Inspection | |||||||
| 48. | EXP 300 project for existing | Mobil Oil | Toyo Engineering | Design Review; Government | 1995 | ||
| refinery at Pioneer Road | Approvals; Construction | ||||||
| Inspection | |||||||
| 49. | Tank 8RF-172 | Mobil Oil | Chiyoda | Design; Government | 1996 | ||
| Singapore | Approvals; Construction | ||||||
| Inspection | |||||||
| 50. | Replace Cone Roof to Tank | Esso | Chiyoda | Design Review; | 1996 | ||
| TK-1120 | S’pore | Singapore | Government Approvals | ||||
| 51. | Upgrading works at Mobil | ||||||
| Jurong Refinery : | Mobil Oil | Mobil Oil | Full Consultancy | 1995 | |||
| o Extension to Workshop | |||||||
| o Fan Coolers to MPHC Plant | |||||||
| 52. | Sludge Farm for existing refinery | Esso S’pore | Esso S’pore | Full Consultancy | 1995 | ||
| at Pulau Ayer Chawan | |||||||
| 53. | De-isopentanizer Plant | Mobil Oil | Chiyoda | Design Review; Government | 1996 | ||
| Singapore | Approvals; Construction | ||||||
| Inspection | |||||||
| 54. | Pit 42, Pulau Busing | Tankstore | Tankstore | Design Review; Government | 1996 | ||
| Building | Limited | Limited | Approvals; Construction | ||||
| Inspection | |||||||
| 55. | Grit Blasting Yard at Pulau | Esso | S’pore Aromatics | Design; Government | 1996 | ||
| Ayer Chawan | S’pore | Approvals; Construction | |||||
| Inspection | |||||||
| 56. | Bitumen Depot, Pandan | Shell Eastern | Chiyoda | Design Review; Government | 1994 | ||
| Road | Singapore | Approvals; Construction | |||||
| Inspection | |||||||
| 57. | Upgrading oily water drainage | Esso S’pore | Esso S’pore | Full Consultancy | 1993 | ||
| system at Marketing Terminal | |||||||
| 58. | Two 9000 KL gasoline storage | Shell Eastern | Shell Eastern | Full consultancy, but | 1994 | ||
| tanks, T-90 and T-99 at P. Bukom | with review only | ||||||
| of Tank Design | |||||||
| 59. | Gas Oil Hydrodesulphurisation | Shell Eastern | Chiyoda | Design Review; | 1994 | ||
| Unit 4 (G.O. – HDS4) | Corporation | Government Approvals | |||||
| 60. | High Octane Continuous | Shell Eastern | Chiyoda | Design Review; | 1994 | ||
| Catalytic Reformer (Platformer 4) | Corporation | Government Approvals | |||||
| 61. | 5 Storage Tanks at | Mobil Oil | Chiyoda | Civil Design; Review of | Dec 1993 | ||
| P. Pesek Terminal | Singapore | Tank Design; | |||||
| Government Approvals | |||||||
| 62. | Waste Water Treatment Plant, | Shell Eastern | Shell Eastern | Design of Civil and | 1992 | ||
| Phase II, P. Bukom (Flocculation | Structural works; Review of | ||||||
| Unit & Centrifuge) | Tank Design; | ||||||
| Government Approvals | |||||||
| 63. | Sour Water Stripper | Mobil Oil | Edeleanu | Civil/structural Design; | 1993 | ||
| Unit 2, Jurong Refinery | Government Approvals | ||||||
| 64. | Pits 15 & 16, Storage | Tankstore | Tankstore | Planning, Review of | 1993 | ||
| Tankfarms, P. Busing | Civil works & Tank Design; | ||||||
| Government Approvals | |||||||
| 65. | Two 10,000m Storage Tanks | Ceylon | Ceylon | Design Review; | 1992 | ||
| at Kolonnawa, Sri Lanka | Petroleum Corp. | Petroleum Corp. | Construction Inspection | ||||
| 66. | 4 Storage Tank at | Oiltanking | Oiltanking | Design Review; Site | 1993 | ||
| P. Seraya (Tankfarm 0) | Inspections; Government | ||||||
| Approvals | |||||||
| 67. | 15,000m Storage Tank, | Ceylon | Ceylon | Design, Specifications | 1992 | ||
| Kolonnawa, Sri Lanka | Petroleum Corp. | Petroleum Corp. | and Bill of Quantities | ||||
| 68. | Phase III Development to | Oiltanking | Oiltanking | Design Review; Site | 1992 | ||
| Existing Oil Storage Terminal | Inspection; Government | ||||||
| (Tankfarm 10 & ancillary works) | Approvals | ||||||
| 69. | Gasoline Tank (T-120) | Shell Eastern | Chiyoda | Design of Civil works; | 1991 | ||
| Singapore | Review of Tank Design; | ||||||
| Government Approvals | |||||||
| 70. | Upgrading to Lube Oil Blending | Esso S’pore | Esso S’pore | Full Consultancy | 1992 | ||
| Facilities at Shipyard Road | |||||||
| 71. | ADO-Dehazing Unit | Esso S’pore | Esso S’pore | Full Consultancy except | 1991 | ||
| Process Equipment Units | |||||||
| 72. | Bulk Storage Terminal | Oiltanking | Oiltanking | Civil Design; Review of | 1992 | ||
| (Phase II) – Tankfarms | Tank Design; Construction | ||||||
| for 14 tanks | Inspection; Government | ||||||
| Approvals | |||||||
| 73. | Storage Tank 222 | Shell Eastern | Sempec | Civil works design | 1991 | ||
| at P. Bukom | including design check | ||||||
| 74. | Storage Terminal at P. Seraya | Caltex (Asia) | Caltex (Asia) | Feasibility Study | 1990 | ||
| 75. | 8 Storage Tanks, Pit 14 | Tankstore | Tankstore | Civil works design; | 1992 | ||
| at P. Busing | Design check on tanks | ||||||

Source: Shell Chemicals magazine Autumn/Winter 2009 during the Ethylene Cracker Complex ground breaking ceremony on 4 May 2010

Petrochemical Plant

Liquefied Ethylene storage tanks and spheres

Fixed roof tanks with fixed water spray protection and fixed foam extinguishing systems

| Category : | Pharmaceutical Plants Project | ||||||
| Project | Owner | Client | Services Provided | Year Completed | |||
| 1. | New cafeteria in Abbvie existing | Abbvie | Abbvie | Design review; Government | 2016 | ||
| building | approvals & construction | ||||||
| inspection | |||||||
| 2. | New wastewater treatment system | Alcon | Veolia Water | Design review; Government | 2016 | ||
| to Alcon | Technologies | approvals & construction | |||||
| inspection | |||||||
| 3. | Singapore Milling Facility | Pfizer | Amec Foster | Design review; Government | 2016 | ||
| Wheeler | approvals & construction | ||||||
| inspection | |||||||
| 4. | Alcon pharmaceutical | Alcon | Alcon | Design review; Government | 2010 | ||
| manufacturing plant at Tuas South | approvals & construction | ||||||
| Avenue 5 & 14 | inspection | ||||||
| 5. | Glycol Chiller A & A | Schering-Plough | Schering-Plough | Design review; Government | 2008 | ||
| works at 50 Tuas West | approvals & construction | ||||||
| Drive | inspection | ||||||
| 6. | GSK Heel Recovery | GSK | Jacobs | Design review; Government | 2007 | ||
| Engineering | approvals & construction | ||||||
| inspection | |||||||
| 7. | A & A to Existing PB3 Building | GSK | Jacobs | Design review; Government | 2008 | ||
| Engineering | approvals & construction | ||||||
| inspection | |||||||
| 8. | A & A to Approved Works | Novartis | Foster | Design; Government | 2007 | ||
| Wheeler | Approvals; Construction | ||||||
| Inspection | |||||||
| 9. | Design of Solvent Storage | Novartis | Sumitomo | Design & application of road | 2007 | ||
| Building extension & application | opening works | ||||||
| of road opening works at | |||||||
| Novartis Plant | |||||||
| 10. | Hydrogenation Facility at | GSK | Jacobs | Design review; Government | 2007 | ||
| no. 1 Pioneer Sector 1 | Engineering | approvals & construction | |||||
| inspection / Clerk-of-works | |||||||
| 11. | Sucralose Facility at Jurong | Tate & Lyle | CH2M Hill | Permitting support | 2007 | ||
| Island (Crystal Project) | |||||||
| 12. | Novartis NSPM Project | Novartis | Foster Wheeler | Design review; Government | 2007 | ||
| approvals & construction | |||||||
| inspection | |||||||
| 13. | Spent Firewater Containment | GSK | GSK | Design; Government | 2004 | ||
| Project | Approvals; Construction | ||||||
| Inspection | |||||||

Alcon16A