Category : | Industrial Plants & Buildings Projects | ||||||
Project | Owner | Client | Services Provided | Year Completed | |||
1. | Conversion of an existing | ExxonMobil | ExxonMobil | Design Review; Government | 2014 | ||
temporary warehouse building | Approvals; Construction | ||||||
to permanent warehouse | Inspection | ||||||
2. | Warehouse expansion for | Novartis | PM Group | Design Review; Government | 2014 | ||
Novartis | Approvals; Construction | ||||||
Inspection | |||||||
3. | West Coast Ferry Terminal – | Shell | CB&I / | Design; Government | 2008 | ||
Temporary facilities for ECC | Scan-Bilt | Approvals; Construction | |||||
Inspection | |||||||
4. | Steel Platform at Pulau Seraya | PowerSeraya | Kosui | Design; Government | 2006 | ||
Approvals; Construction | |||||||
Inspection | |||||||
5. | A & A to Fire Chemical | Alteco | Alteco | Design Review; Government | 2008 | ||
Plant | Approvals; Construction | ||||||
Inspection | |||||||
6. | Container Berth & Stacking | PSA | Toa | PE services for piling works, | 2008 | ||
Yard at Pasir Panjang | Corporation | temporary works & | |||||
Terminal | permitting | ||||||
7. | 30mgd Seawater Desalination | SingSpring | Loh & Loh | Re-engineering for | 2004 | ||
Plant at Tuas South Ave 1 | Construction | Structural Optimization | |||||
(Hyflux Hydrochem) | |||||||
8. | Orimulsion Project (Land) | Power Seraya | IHI Japan | Design; Government | 2006 | ||
at Jurong Island | Approvals; Construction | ||||||
Inspection | |||||||
9. | Access Stairway at existing | Eastman | Technip- | Design; Government | 2003 | ||
OXO Plant | Chemical | Coflexip | Approvals; Construction | ||||
Inspection | |||||||
10. | Singapore Combined Cycle | Tuas Power | Mitsubishi | Design Review; Government | 2005 | ||
Power Plant at Tuas | Corporation | Approvals; Construction | |||||
Inspection | |||||||
11. | Additions & Alterations to | Adampark & | Kunyi (S) | Design; Government | 2002 | ||
Existing 2-storey Factory | Print Pte Ltd | Approvals; Construction | |||||
at No. 6 Loyang Way 4 | Inspection | ||||||
12. | Additions & Alterations (Truck | Oiltanking | Oiltanking | Government | 2002 | ||
Loading Bay & Ancillary Facilities) | Singapore | Singapore | Submission | ||||
to existing Chemical Storage | Chemical Storage | Chemical Storage | |||||
Terminal at Seraya Ave | |||||||
13. | Temporary MBS 3 site | Mitsui Bisphenol | Leads | Design Review | 2001 | ||
offices and Ancillary | Singapore | Engineering | |||||
Facilities at Pulau Sakra | |||||||
14. | Additional of a 12″ and 2 | Petrochemical | CBI Overseas, | Piperack Evaluation | 2001 | ||
nos. 6″ pipelines at PCS | Corporation of | LLC | |||||
existing piperack | Singapore | ||||||
15. | Integrated Maintenance | Rotary IMC | Rotary IMC | Full Consultancy | 2001 | ||
Centre | Pte Ltd | Pte Ltd | |||||
16. | Sewerage Treatment Plant | Ministry of the | Loh & Loh | Civil / Structural Design; | 2000 | ||
No. 2 on Jurong Island | Environment – | Construction | Government Approvals | ||||
Sewerage Dept. | |||||||
17. | Proposed Mainland Ferry | Lands & Estates | Loh & Loh | Full Consultancy | 1998 | ||
Terminal at Nicoll Drive | Organisation | Construction | |||||
18. | Electrical substation | Van Ommeren | Rotary | Full Consultancy | 1998 | ||
Engineering | |||||||
19. | Design for Singapore Distribution | Air Products | Loh & Loh | Tender Design | 1997 | ||
Centre | Pte Ltd | Construction | |||||
20. | Batam Slipway and Workshop | Loh & Loh | PT Loh & Loh | Equipment & Workshop | 1997 | ||
Construction | Construction | Foundation Design only | |||||
Indonesia | |||||||
21. | Machining & Die-Casting | PT Timor | Audex | Civil / Structural Design | 1997 | ||
Shop at West Java | Industri Komponen | ||||||
22. | Press Shop at West Java | PT Timor | Audex | Civil / Structural Design | 1997 | ||
Industri Komponen | |||||||
23. | Additions & Alterations to | Oiltanking | Rotary | Full Services | 1997 | ||
Existing Power Station at | Singapore | Engineering | |||||
Pulau Seraya | |||||||
24. | Fish Market Complex at | Public Works | Loh & Loh | Alternative Design | 1997 | ||
Senoko | Department | Construction | |||||
25. | Contractor’s Yard at Off | Mobil Oil | Sennett Civil & | Design; Government | 1997 | ||
Tg. Kling | General Contr. | Submission; Construction | |||||
Inspection | |||||||
26. | Bus Assembly Factory | Sinbus | Sinbus | Layout Planning & | 1997 | ||
(Ho Chee Minh City) | Engineering | Engineering | Preliminary Design | ||||
Pte Ltd | Pte Ltd | ||||||
27. | Chugoku Paint Varnish Plant | Chugoku Marine | Chiyoda | Full Services | 1997 | ||
Paints Pte Ltd | Singapore | ||||||
28. | Proposed 6.6KV/LV Substation | Jurong Town | Penta Ocean | Design; Government | 1996 | ||
at Pulau Damar Laut | Corporation | Approvals; Construction | |||||
Inspection | |||||||
29. | Senoko Gasworks Development | PUB (Gas) | Mitsui | Design Review; Government | 1996 | ||
Engineering | Approvals; Construction | ||||||
Inspection | |||||||
30. | Factory and Office Complex, | Rotary | Rotary | Full Consultancy | 1993 | ||
Tuas Avenue 20 | Engineering | Engineering | |||||
31. | 3 Nos. Transformer Oil | NI Transformer | NI Transformer | Full Consultancy | 1992 | ||
Storage Tanks and Ancillaries | |||||||
32. | 3-storey Warehouse, | King Spice | King Spice | Full Consultancy | 1992 | ||
Toh Guan Road, S’pore | Investments | Investments | |||||
33. | Cofferdam for Sewer | Ministry of the | Julian | Full Consultancy | 1991 | ||
Flow Diversion Scheme | Environment | Construction | |||||
34. | Paint Factory Complex | Chugoku | Penta Ocean | Full Consultancy | 1992 | ||
at Johore Port | Paint (M) | Paint (M) | 1994* | ||||
35. | Additions & Alterations to | Harris | Harris | Full Consultancy | 1992 | ||
Office Laboratory & | Semiconductor | Semiconductor | |||||
Light Workshop Areas | |||||||
36. | Cellular Mobil Telephone | Singapore | C.Itoh/NESIC | Full Consultancy | On-going | ||
System – Antennae | Telecoms | from 1990 | |||||
* | Warehouse Extension |
Orimulsion Project
Category : | Marine Facilities | ||||||
Project | Owner | Client | Services Provided | Year Completed | |||
1. | Jetty 12 – Piperacks extension | Oiltanking | Oiltanking | QP – Design, Construction | 2014 | ||
tier | & Government Approvals | ||||||
Services | |||||||
2. | Modifications to existing | Oiltanking | Oiltanking | QP – Design, Construction | 2014 | ||
Oiltanking Jetty piperacks for | & Government Approvals | ||||||
Vitol Upgrade Project | Services | ||||||
3. | Construction of container berths | PSA | Penta-Ocean/ | QP – Construction Services | 2014 | ||
P31-P33 and stacking yards at | Hyundai/Koon JV | ||||||
Pasir Panjang Terminal, Phase III | |||||||
4. | Protection Bund Wall and | Jurong Corporation | Toa Corporation | QP – Design, Construction | 2014 | ||
Relocation of Solids Handling | & Government Approvals | ||||||
Pier at Ayer Chawan Basin | Services | ||||||
5. | Jurong Aromatics Complex | JAC | ESSAR | QP – Design, Construction | 2016 | ||
(OSBL, ICP & Jetty) | & Government Approvals | ||||||
Services | |||||||
6. | Construction of container | PSA | Toa Corporation | QP – Construction Services | 2011 | ||
berths & stacking yards on | |||||||
Jurong Island | |||||||
7. | Vopak – Jetty 5 | Vopak | McConnell | Design Engineering | 2008 | ||
Dowell | |||||||
8. | Tekong Reclamation – Eastern | HDB / Surbana | Toa-JDN (PUT) | PE – Design, Construction | 2011 | ||
Profile of Area D | Joint Venture | & Government Approvals | |||||
Services | |||||||
9. | ECC – Temporary Mainland | Shell | CB&I | QP – Design, Construction | 2008 | ||
Ferry Terminal at West Coast | & Government Approvals | ||||||
Services | |||||||
10. | ECC – Permanent Marine | Shell | CB&I | QP – Design, Construction | 2008 | ||
Facilities (Unloading Quay) | & Government Approvals | ||||||
Services | |||||||
11. | ECC – Temporary Marine | Shell | CB&I | QP – Design, Construction | 2008 | ||
Facilities (Passenger | & Government Approvals | ||||||
Pontoon & Ro-Ro Ramp) | Services | ||||||
12. | PT SMOE Batam Yard | PT SMOE | Loh & Loh | Design / Value | 2006 | ||
Construction | Engineering | ||||||
13. | Vopak Finger Jetties | Vopak | McConnell | Design | 2006 | ||
at Jurong Island | Dowell | ||||||
14. | Jetty 2A at Jurong Island | Oiltanking | Oiltanking | QP – Design, Construction | 2005 | ||
& Government Approvals | |||||||
Services | |||||||
15. | Orimulsion Project (Marine) | Power Seraya | IHI Japan | QP – Design, Construction | 2006 | ||
at Jurong Island | & Government Approvals | ||||||
Services | |||||||
16. | Fish Farm off St. John’s Island | Agri-Food & Vet | Datawin | Design | 2003 | ||
Authority | Enterprises | ||||||
17. | PUT Land Reclamation Project | Housing & | Toa Corporation | Temporary works design | 2001 | ||
Development | |||||||
Board | |||||||
18. | Temporary Site Facilities for | Housing & | Toa Corporation | Full Consultancy | 2001 | ||
Pulau Ubin and Tekong | Development | ||||||
Reclamation Project | Board | ||||||
19. | Staging Ground at Changi | Housing & | Toa Corporation | Full Consultancy | 2001 | ||
East for Pulau Ubin and | Development | ||||||
Tekong Reclamation Project | Board | ||||||
20. | Chemical Jetties (J11 & J12) | Oiltanking | Oiltanking | QP – Design, Construction | 2002 | ||
at Pulau Seraya | Singapore | Singapore | & Government Approvals | ||||
Chemical Storage | Chemical Storage | Services | |||||
21. | Marine Loading / Unloading | Exxon Chemical | Toa Corporation | QP – Design, Construction | 2000 | ||
Jetty Facilities for SOP on | & Government Approvals | ||||||
Pulau Ayer Chawan | Services | ||||||
22. | Construction of Berth J24 and | JTC | Daewoo Corp.- | Alternative design; | 2000 | ||
25 on Foreshore and seabed | Loh & Loh J.V. | Temporary works design; | |||||
at Pulau Damar Laut | Rectification works design | ||||||
23. | Feasibility study for submarine | Tankstore | Tankstore | Preliminary design, order of | 1999 | ||
pipelines from P. Busing to | cost estimate and MPA & | ||||||
Jurong Island | Land Office approval | ||||||
24. | Marine Facilities for SOP on | Exxon | Kellogg-Chiyoda | QP – Design, Construction | 2000 | ||
Pulau Ayer Chawan | Chemical | & Government Approvals | |||||
Services | |||||||
25. | Temporary Marine Landings | Exxon | Toa Corporation | Professional Engineering | 1999 | ||
and Ramps for SCC Project | Chemical | Consultancy services | |||||
26. | North Eastern Reclamation | Housing & | Toa Corporation – | PE – Design, Construction | 2001 | ||
Phase 4 – Area at Punggol | Development | JDN J.V. | & Government Approvals | ||||
and Coney Island | Board | Services | |||||
27. | Tanker Jetty No. 5, P. Sebarok | Penta Ocean | Penta Ocean | Temporary works design | 1997 | ||
(Engineering Design) | |||||||
28. | Thivai Tanker Jetty | Saigon Petroleum | Ng Huat | Tender Design only | Not Available | ||
Construction | |||||||
29. | Jetty 5 – (Topside) | Van Ommeren | Chiyoda | QP – Design, Construction | 1997 | ||
Singapore | & Government Approvals | ||||||
Services | |||||||
30. | Jetty @ Senoko | Public | Mitsui | Tender Design | Not Available | ||
Utilities Board | Engineering | ||||||
31. | Chemical Jetty, Water | Seraya | Penta Ocean | Government Approvals | 1997 | ||
Intake, Water Outfall | Chemicals | ||||||
32. | Ro-Ro Ramps, Personnel | Seraya | Penta Ocean | Full Consultancy | 1995 | ||
Jetty, Barge Quay | Chemicals | ||||||
33. | Technical feasibility study | Caltex (S) Pte Ltd | Caltex (S) Pte Ltd | Feasibility Study | 1995 | ||
to replace existing submarine | |||||||
pipelines with pipelines on | |||||||
existing trestle for Caltex’s | |||||||
jetties 1, 2, 4, 5, 6 & 7 | |||||||
34. | Technical feasibility study | Esso S’pore | Esso S’pore | Design Services | 1994 | ||
on upgrading Bulk Barge | |||||||
Pier, Shipyard Road | |||||||
35. | Tanker Jetty 6, P. Seraya | Oiltanking | Oiltanking | Full Consultancy | 1995 | ||
36. | Technical study for Gangways | Caltex (S) Pte Ltd | Caltex (S) Pte Ltd | Design Services | 1994 | ||
for Jetties 3, 4, 6 & 7 | |||||||
37. | Vehicle Barge Ramp, | Petrochemical | Petrochemical | Full Consultancy | 1994 | ||
Tg. Penjuru | Corp. of S’pore | Corp. of S’pore | |||||
38. | 5000 DWT Tanker Berth & | Petrochemical | Petrochemical | Full Consultancy | 1994 | ||
Vehicle Barge Ramp, P. | Corp. of S’pore | Corp. of S’pore | |||||
Ayer Merbau | |||||||
39. | Passenger Jetty & Vehicle | Petrochemical | Petrochemical | Full Consultancy | 1994 | ||
Barge Ramp, P. Ayer Merbau | Corp. of S’pore | Corp. of S’pore | |||||
40. | Erection of 230 ton | Mobil Oil | Rotary | Design and site supervision | 1992 | ||
Prefabricated Hose Rack | Engineering | of erection method and | |||||
rigging arrangement | |||||||
41. | Repair to damaged Quay | Public | Oiltanking | Full Consultancy | 1993 | ||
Utilities Board | |||||||
42. | Tanker Jetty 5, | Tankstore | Tankstore | QP – Design, Construction | July 1993 | ||
P. Busing | & Government Approvals | ||||||
Services | |||||||
43. | Tanker Jetty 2, Tg. Penjuru | Caltex (S) Pte Ltd | Caltex (S) Pte Ltd | Full Consultancy | 1993 | ||
44. | Improvements to Approachway | Oiltanking | Oiltanking | Full Consultancy | 1992 | ||
to Tanker Jetties MJ2 and | |||||||
MJ4, P. Seraya (Dredging) | |||||||
45. | LPG Jetty (3 Berths) at | Petrochemical | Penta Ocean | Planning, preliminary | 1991 | ||
P. Seraya | Corp. of S’pore | investigation & designing for | |||||
feasibility study | |||||||
46. | Temporary Works for Subsea | Mobil Oil | Toa Corporation | Alternative Design | 1991 | ||
Pipelaying and Modifications to | |||||||
Marine Trestle, Berth 1 & Berth 4 | |||||||
47. | Lube Jetty at Seduan, | Petronas | Tenaga Ewbank | Planning design & drafting | 1991 | ||
Sibu, Malaysia | Dagangan | Preece | |||||
48. | Tanker Jetties for | Petronas | Penta Ocean | Tender alternative design | 1991 | ||
Melaka Refinery | |||||||
49. | Repairs to Berths 1, 4 | Mobil Oil | Presscrete | Design of repair works; | 1990 | ||
& Pesek Jetty | Engineering | Technical inspections | |||||
50. | Tanker Jetty for | Shell Eastern | Penta Ocean | Alternative designs of | 1991 | ||
Pandan Installation | structure (partial) | ||||||
51. | Tanker Jetties 4 and 5 | Oiltanking | Oiltanking | Full Consultancy | 1991 | ||
at P. Seraya |
Extension of Approach Trestle and addition of Petroleum Jetty for vessels up to 160,000 DWT
Deep water Chemical & Petroleum Jetty for vessels of 1,000 DWT to 120,000 DWT
1 km long electric power cable bridge (right) with 12m low spans and 2 x 50m high spans
Feasibility study on Bulk Liquid Storage Terminal
Category : | Petrochemical & Refinery Plants Projects | ||||||
Project | Owner | Client | Services Provided | Year Completed | |||
1. | Aurora / EOS – QP Consulting | ExxonMobil | ExxonMobil | Planning application | 2015 | ||
for Planning | |||||||
2. | Addition of pipelines from OOTS | Oiltanking | Oiltanking | Design Review; Government | 2014 | ||
to PCS & M/s Lanxess | Odfjell | Odfjell | Approvals; Construction | ||||
Inspection | |||||||
3. | Jurong Aromatics Complex | JAC | SK | Design Review; Government | 2016 | ||
(ISBL) | Engineering | Approvals; Construction | |||||
Inspection | |||||||
4. | Cumene2/OSBL Main Utility | Chang Chun | Fu-Tai | Design Review; Government | 2013 | ||
Facilities; VAM Plant & AAL | Group | Engineering | Approvals; Construction | ||||
Plant | Inspection | ||||||
5. | Q-Chem II Revamp | Oiltanking | Oiltanking | Design Review; Government | 2011 | ||
Odfjell | Odfjell | Approvals; Construction | |||||
Inspection | |||||||
6. | EM SPT SOP2 – Temporary | ExxonMobil | LBG-NGT Corp | Design | 2009 | ||
facilities | |||||||
7. | Chem 6 | Oiltanking | Oiltanking | Design Review; Government | 2009 | ||
Odfjell | Odfjell | Approvals; Construction | |||||
Inspection | |||||||
8. | EM SPT – SOP2 Olefins | ExxonMobil | Shaw Stone & | Design Review; Government | 2013 | ||
Recovery Project | Webster | Approvals; Construction | |||||
Inspection | |||||||
9. | Chem 5 / PO & Matrix | Oiltanking | Oiltanking | Review and Government | 2009 | ||
Storage Terminal Project | Odfjell | Odfjell | Permitting Licencing | ||||
Application to FSSD | |||||||
10. | EM SPT – A&A works at | ExxonMobil | Foster Wheeler | Design Review; Government | 2009 | ||
ACB, SOP & SAR | Approvals; Construction | ||||||
Inspection | |||||||
11. | EM SPT – Government | ExxonMobil | Foster Wheeler | Design Review; Government | 2009 | ||
Permitting (Main) | Approvals; Construction | ||||||
Inspection | |||||||
12. | ExxonMobil Turn-Around | ExxonMobil | CBI | Design Review; Government | 2006 | ||
Approvals; Construction | |||||||
Inspection | |||||||
13. | Additions of ancillary buildings | ExxonMobil | ExxonMobil | Full Consultancy | 2004 | ||
within existing Singapore | |||||||
Chemical Plant at PAC | |||||||
14. | Chem 3 & Chem 4 and related | Oiltanking | Oiltanking | Design Review; Government | 2003 | ||
facilities at Pulau Seraya | Odfjell | Odfjell | Approvals; Construction | ||||
Inspection | |||||||
15. | Addition of Ancillary Facilities | Oiltanking | Rotary | Government Submission | 2002 | ||
(Carbon Adsorber) at TF80 | Singapore | Engineering | |||||
at Pulau Seraya | Chemical Storage | ||||||
16. | Addition of Pipebridge and | Oiltanking | Rotary | Government Submission | 2002 | ||
Ancillary Facilities to existing | Singapore | Engineering | |||||
Chemical Storage Terminal | Chemical Storage | ||||||
at Pulau Seraya | |||||||
17. | Site Integration Project | ExxonMobil | Foster Wheeler | Design Review; Government | 2002 | ||
Asia Pacific | Approvals; Construction | ||||||
Inspection | |||||||
18. | Repair and Erection of | ExxonMobil | Kellogg- | Design Review; Government | 2001 | ||
Equipment, Piperacks and | Chiyoda | Approvals; Construction | |||||
other Ancillaries at Existing | Inspection | ||||||
Singapore Chemical | |||||||
Complex at Pulau Ayer | |||||||
Chawan | |||||||
19. | Addition of Piperacks & | Seraya Chemicals | Audex | Design Review; Government | 2001 | ||
other Ancillaries to existing | Singapore | Pte Ltd | Approvals; Construction | ||||
Refinery at Pulau Seraya | Inspection | ||||||
20. | Addition of Piperacks & | Seraya Chemicals | Oiltanking | Design Review; Government | 2002 | ||
Ancillary Facilities to existing | Singapore | Singapore | Approvals; Construction | ||||
Seraya Petrochemical | Chemical Storage | Inspection | |||||
Complex at Pulau Seraya | |||||||
21. | Addition of equipment and | Petrochemical | CBI Overseas, | Full Consultancy | 2001 | ||
structure and storage tank | Corporation of | LLC | |||||
to existing PCS II Ethylene | Singapore | ||||||
Plant at Pulau Ayer Merbau | |||||||
22. | Steel Vertical & Horizontal | Oiltanking S’pore | Oiltanking S’pore | Design Review; Government | 2002 | ||
Storage tanks, Pipebridges, | Chemical Storage | Chemical Storage | Approvals; Construction | ||||
Piperacks & Ancillary Facilities | Pte Ltd | Pte Ltd | Inspection | ||||
at Pulau Seraya | |||||||
23. | Additions of 1 no. of Steel | Vopak Terminals | Chiyoda | Design Review; Government | 2000 | ||
Storage Tank (TK-0909) and | Singapore | Approvals; Construction | |||||
Ancillary Facilities on Jurong | Inspection | ||||||
Island | |||||||
24. | Additions of Truck Loading Bay | Vopak Terminals | Rotary | Design Review; Government | 2000 | ||
to existing Terminal at Pulau | Engineering | Approvals; Construction | |||||
Sakra | Inspection | ||||||
25. | Additions of 6 nos. of Steel | Vopak Terminals | Rotary | Design Review; Government | 2000 | ||
Storage Tanks, Piperacks, | Engineering | Approvals; Construction | |||||
Pipebridges, and other | Inspection | ||||||
Ancillary Facilities (Pit 1) | |||||||
on Jurong Island | |||||||
26. | Chemical Storage Terminal | Van Ommeren | Chiyoda | Design Review; Government | 1999 | ||
(Celanese AA/AE Storage | Singapore | Approvals; Construction | |||||
Facilities) | Inspection | ||||||
27. | Singapore Acetyls Project | Celanese | Celanese | Design Review; Government | 2000 | ||
Singapore | Singapore | Approvals; Construction | |||||
Inspection | |||||||
28. | Chemical Storage Terminal | Van Ommeren | Rotary | Design Review; Government | 1999 | ||
(MBS Storage Facilities) | Engineering | Approvals; Construction | |||||
Inspection | |||||||
29. | Singapore Olefins Plant on | Exxon Chemical | Kellogg-Chiyoda | Design Review; Government | 2001 | ||
Jurong Island | Approvals; Construction | ||||||
Inspection | |||||||
30. | TITAN/LDPE Project | Titan Polyethylene | Mitsui | Civil / Structural Design | 1999 | ||
(Malaysia) | Engineering | (US$20m) | |||||
31. | Chemical Storage Terminal | Van Ommeren | Rotary | Design Review; Government | 1998 | ||
(NSC/Lonza Storage Facilities) | Engineering | Approvals; Construction | |||||
Inspection | |||||||
32. | Chemical Storage Terminal | Van Ommeren | Rotary | Design; Government | 1998 | ||
(SMAG Storage Facilities) | Engineering | Approvals; Construction | |||||
Inspection | |||||||
33. | 4 Nos. Storage Tanks at | Van Ommeren | Rotary | Design Review; Government | 1997 | ||
Pulau Sakra | Engineering | Approvals; Construction | |||||
Inspection | |||||||
34. | Singapore Manufacturing Plant | Chevron Chemical | Chiyoda | Design Review; Government | 1998 | ||
Singapore | Approvals; Construction | ||||||
Inspection | |||||||
35. | Additions & Alterations to | Exxon Chemical | S’pore Aromatics | Design; Government | 1996 | ||
Central Building at P. Ayer Chawan | Approvals; Construction | ||||||
Inspection | |||||||
36. | Control Building including | Singapore | Singapore | Full Consultancy | 1996 | ||
workshops, administration & | Aromatics | Aromatics | |||||
warehousing for Paraxylene / | Company | Company | |||||
Benzene Plant | |||||||
37. | Chemical Storage Terminal, | Van Ommeren | Van Ommeren | Full Consultancy for | 1993 | ||
P. Sakra, Buildings & | Buildings & Civil works; | ||||||
Tankfarms | Government Approvals | ||||||
38. | Offsite Piperacks for | Mobil Oil | Mobil Oil | Full Consultancy | 1992 | ||
CCR/Aromatics Plant | |||||||
1. | Modifications to existing Chem 6 | Oiltanking | Oiltanking | Design Review; Government | 2016 | ||
storage tanks T-8709 & T-8713 | Odfjell | Odfjell | Approvals; Construction | ||||
Inspection | |||||||
2. | Project Silver – Pandan Terminal | Shell Eastern | Shell Eastern | Design Review; Government | 2015 | ||
Approvals; Construction | |||||||
Inspection | |||||||
3. | Mogas Efficiency Project – | Oiltanking | Oiltanking | Design Review; Government | 2015 | ||
Conversion of existing Boiler | Approvals; Construction | ||||||
House into Substation at | Inspection | ||||||
Jurong Island | |||||||
4. | ECC Debottlenecking and | Shell Eastern | Toyo | Design Review; Government | 2015 | ||
Flare Revamp Projects | Engineering | Approvals; Construction | |||||
Inspection | |||||||
5. | Sphere Tankfarm and related | Oiltanking | Oiltanking | Design Review; Government | 2014 | ||
facilities | Odfjell | Odfjell | Approvals; Construction | ||||
Inspection | |||||||
6. | CARADOL Projects | Oiltanking | Oiltanking | Design Review; Government | 2014 | ||
Odfjell | Odfjell | Approvals; Construction | |||||
Inspection | |||||||
7. | Benzene System Modification | Oiltanking | Oiltanking | Design Review; Government | 2010 | ||
Odfjell | Odfjell | Approvals; Construction | |||||
Inspection | |||||||
8. | Propylene system modification | Oiltanking | Oiltanking | Design Review; Government | 2010 | ||
at TF83 at Jurong Island | Odfjell | Odfjell | Approvals; Construction | ||||
Inspection | |||||||
9. | Phase 10 – Petroleum Storage | Oiltanking | Oiltanking | Design Review; Government | 2011 | ||
Terminal at Jurong Island | Approvals; Construction | ||||||
Inspection | |||||||
10. | A&A to existing Invista Adipic | Invista | CBI | Design Review; Government | 2009 | ||
site involving erection of 1 no. | Approvals; Construction | ||||||
Ammonia Storage Tank & | Inspection | ||||||
ancillary facilities at 1 Sakra Ave | |||||||
11. | Ethylene Cracker Complex at | Shell Eastern | CB&I | Design Review; Government | 2010 | ||
Pulau Ular | Approvals; Construction | ||||||
Inspection | |||||||
12. | Pits 11 & 5 at Pulau | Vopak | Chiyoda | Design Review; Government | 2008 | ||
Sebarok | Approvals; Construction | ||||||
Inspection | |||||||
13. | Bukom Refinery Modification | Shell Eastern | FWAP | Design Review; Government | 2010 | ||
at Pulau Bukom | Approvals; Construction | ||||||
Inspection | |||||||
14. | Temporary earthworks for | Vopak | Toh Teck Seng | Design; Government | 2007 | ||
Proposed Pit 11 & Extension | Approvals; Construction | ||||||
of Pit 5 at Pulau Sebarok | Inspection | ||||||
15. | Upgrade Existing 1 no. | ExxonMobil | ExxonMobil | Design Review; Government | 2007 | ||
Class 3 Storage Tank to | Approvals; Construction | ||||||
Class 1 at SCC | Inspection | ||||||
16. | EM SPT – Temporary Facilities | ExxonMobil | FWP | Design Review; Government | 2008 | ||
for Area 17 | Approvals; Construction | ||||||
Inspection | |||||||
17. | EM SPT – Government | ExxonMobil | FWP | Design Review; Government | 2006 | ||
Permitting (Temporary | Approvals; Construction | ||||||
Services) | Inspection | ||||||
18. | Pit 11 & extension of Existing | Vopak | Vopak | Design Review; Government | 2006 | ||
Pit 5 for Class III Petroleum | Approvals; Construction | ||||||
Storage & related facilities at | Inspection | ||||||
Pulau Sebarok | |||||||
19. | ITT Pipelines from OTS Terminal | Oiltanking | Oiltanking | Design Review; Government | 2007 | ||
to Phase 6 | Approvals; Construction | ||||||
Inspection | |||||||
20. | Phase 7 – Petroleum Storage | Oiltanking | Oiltanking | Design Review; Government | 2008 | ||
Terminal at Jurong Island | Approvals; Construction | ||||||
Inspection | |||||||
21. | Phase 6 – Petroleum Storage | Oiltanking | Oiltanking | Design Review; Government | 2008 | ||
Terminal at Jurong Island | Approvals; Construction | ||||||
Inspection | |||||||
22. | 2 nos. Heat Exchangers at | ExxonMobil | ExxonMobil | Design; Government | 2004 | ||
existing SPA Plant | Approvals | ||||||
23. | SPO Yard Expansion Project | ExxonMobil | ExxonMobil | Full Consultancy | 2003 | ||
at SCP on Jurong Island | |||||||
24. | SCP Laboratory Store/Sample | ExxonMobil | ExxonMobil | Design | 2003 | ||
Retention Annex | |||||||
25. | Pit 10 at Pulau Sebarok | Vopak Terminals | Chiyoda | Government Approvals | 2003 | ||
Singapore | |||||||
26. | 3 nos. of Holding Tank | Croda | Audex | Design Review; Government | 2001 | ||
Singapore | Pte Ltd | Approvals; Construction | |||||
Inspection | |||||||
27. | Addition of Piperacks, | Oiltanking | Audex | Design Review; Government | 2001 | ||
Pipebridges & other Ancillaries | Singapore | Pte Ltd | Approvals; Construction | ||||
to existing Oil Storage | Inspection | ||||||
Terminal at Pulau Seraya | |||||||
28. | Additions of 6 nos. of Steel | Vopak Terminals | Sumitomo | Full Consultancy | 2001 | ||
Storage Tanks, Piperacks, | Chemical | ||||||
Pipebridges, and other | Engineering | ||||||
Ancillary Facilities on Jurong | |||||||
Island | |||||||
29. | Control Building at JINEX PIB | Jinzhou Jinex | JGC | Specialist Design | 1999 | ||
Project | Lubricant | Singapore | |||||
(Jinzhou – China) | Additives Co. Ltd | ||||||
30. | 4 Storage Tanks at Pulau | Shell Eastern | CBI Overseas | Design Review; Government | 2000 | ||
Bukom | Approvals; Construction | ||||||
Inspection | |||||||
31. | Lube Oil Plant at Turkmenbashi | Ministry of Oil | Edeleanu | Design of Civil works | 2000 | ||
Refinery, Turkmenistan | & Gas Industries | (S$5m) | |||||
and Resources | |||||||
of Turkmenistan | |||||||
32. | Condensate Splitter Unit | Chiyoda | Shell Eastern | Design Review; Government | 2000 | ||
Project on Pulau Bukom | Corporation | Approvals; Construction | |||||
Inspection | |||||||
33. | Additions & Alterations to | Singaport | Singaport | Full Consultancy | 1999 | ||
Existing Slop Reception | Cleanseas | Cleanseas | |||||
Centre | |||||||
34. | Zhuhai Terminal (VOPAK) | Van Ommeren / | Van Ommeren / | Specialist advice | 1997 | ||
Paktank | Paktank | ||||||
35. | Oil Drainage System (SEPL) | Shell Eastern | Stork Comprimo | Feasibility Study | 1996 | ||
Pit 43 (Feasibility Study) | Petroleum | ||||||
36. | Iso-Pentane (Planning Approval | Mobil Oil | Chiyoda | Design; Government | 1996 | ||
only) | Singapore | Approvals; Construction | |||||
Inspection | |||||||
37. | Additions of CCR Booster | Mobil Oil | Foster Wheeler | } | } | ||
Compressor; | } Design Review; | } | |||||
Existing Refinery Heater / | Mobil Oil | Mobil Oil | } Government Approvals; | } 1997 | |||
Exchanger & | } Construction Inspection | } | |||||
Fin Fan Cooler / Exchanger | Mobil Oil | Mobil Oil | } | } | |||
38. | Structural Repair to Existing | Mobil Oil | Mobil Oil | Design; Construction | 1997 | ||
Refinery Structures | Inspection | ||||||
39. | Solvent Debottlenecking at | Esso | Edeleanu Asia | Design; Government | 1997 | ||
Pulau Ayer Chawan | S’pore | Approvals; Construction | |||||
Inspection | |||||||
40. | Additions & Alterations to | Elf Atochem | Foster Wheeler | Design Review; Government | 1997 | ||
Existing Compounding Plant | (S.E.A) | Eastern | Approvals; Construction | ||||
Inspection | |||||||
41. | Blast Resistant Wall | Esso | Esso | Design; Construction | 1996 | ||
S’pore | S’pore | Inspection | |||||
42. | Additions & Alterations to | Mobil Oil | Mobil Oil | Design; Government | 1997 | ||
Existing Maintenance Workshop | Approvals; Construction | ||||||
& Fire House | Inspection | ||||||
43. | LRCC Unit Revamp & | Shell Eastern | Chiyoda | Design Review; Government | 1997 | ||
Performance Enhancement | Petroleum | Singapore | Approvals; Construction | ||||
Inspection | |||||||
44. | Improvements to Fire Fighting | Caltex (S) Pte Ltd | Caltex (S) Pte Ltd | Design; Construction | 1996 | ||
System | Inspection | ||||||
45. | Pump floor Extension, Analyser | Shell Eastern | Shell Eastern | Full Services | 1997 | ||
House, etc | Petroleum | Petroleum | |||||
46. | Pit 8 & 9 at Pulau Sebarok | Van Ommeren | Chiyoda | Full Services | 1997 | ||
Singapore | |||||||
47. | 17.2m Spherical Tank at | Mobil Oil | Toyo Kanetsu | Design; Government | 1996 | ||
Pulau Pesek | K.K | Approvals; Construction | |||||
Inspection | |||||||
48. | EXP 300 project for existing | Mobil Oil | Toyo Engineering | Design Review; Government | 1995 | ||
refinery at Pioneer Road | Approvals; Construction | ||||||
Inspection | |||||||
49. | Tank 8RF-172 | Mobil Oil | Chiyoda | Design; Government | 1996 | ||
Singapore | Approvals; Construction | ||||||
Inspection | |||||||
50. | Replace Cone Roof to Tank | Esso | Chiyoda | Design Review; | 1996 | ||
TK-1120 | S’pore | Singapore | Government Approvals | ||||
51. | Upgrading works at Mobil | ||||||
Jurong Refinery : | Mobil Oil | Mobil Oil | Full Consultancy | 1995 | |||
o Extension to Workshop | |||||||
o Fan Coolers to MPHC Plant | |||||||
52. | Sludge Farm for existing refinery | Esso S’pore | Esso S’pore | Full Consultancy | 1995 | ||
at Pulau Ayer Chawan | |||||||
53. | De-isopentanizer Plant | Mobil Oil | Chiyoda | Design Review; Government | 1996 | ||
Singapore | Approvals; Construction | ||||||
Inspection | |||||||
54. | Pit 42, Pulau Busing | Tankstore | Tankstore | Design Review; Government | 1996 | ||
Building | Limited | Limited | Approvals; Construction | ||||
Inspection | |||||||
55. | Grit Blasting Yard at Pulau | Esso | S’pore Aromatics | Design; Government | 1996 | ||
Ayer Chawan | S’pore | Approvals; Construction | |||||
Inspection | |||||||
56. | Bitumen Depot, Pandan | Shell Eastern | Chiyoda | Design Review; Government | 1994 | ||
Road | Singapore | Approvals; Construction | |||||
Inspection | |||||||
57. | Upgrading oily water drainage | Esso S’pore | Esso S’pore | Full Consultancy | 1993 | ||
system at Marketing Terminal | |||||||
58. | Two 9000 KL gasoline storage | Shell Eastern | Shell Eastern | Full consultancy, but | 1994 | ||
tanks, T-90 and T-99 at P. Bukom | with review only | ||||||
of Tank Design | |||||||
59. | Gas Oil Hydrodesulphurisation | Shell Eastern | Chiyoda | Design Review; | 1994 | ||
Unit 4 (G.O. – HDS4) | Corporation | Government Approvals | |||||
60. | High Octane Continuous | Shell Eastern | Chiyoda | Design Review; | 1994 | ||
Catalytic Reformer (Platformer 4) | Corporation | Government Approvals | |||||
61. | 5 Storage Tanks at | Mobil Oil | Chiyoda | Civil Design; Review of | Dec 1993 | ||
P. Pesek Terminal | Singapore | Tank Design; | |||||
Government Approvals | |||||||
62. | Waste Water Treatment Plant, | Shell Eastern | Shell Eastern | Design of Civil and | 1992 | ||
Phase II, P. Bukom (Flocculation | Structural works; Review of | ||||||
Unit & Centrifuge) | Tank Design; | ||||||
Government Approvals | |||||||
63. | Sour Water Stripper | Mobil Oil | Edeleanu | Civil/structural Design; | 1993 | ||
Unit 2, Jurong Refinery | Government Approvals | ||||||
64. | Pits 15 & 16, Storage | Tankstore | Tankstore | Planning, Review of | 1993 | ||
Tankfarms, P. Busing | Civil works & Tank Design; | ||||||
Government Approvals | |||||||
65. | Two 10,000m Storage Tanks | Ceylon | Ceylon | Design Review; | 1992 | ||
at Kolonnawa, Sri Lanka | Petroleum Corp. | Petroleum Corp. | Construction Inspection | ||||
66. | 4 Storage Tank at | Oiltanking | Oiltanking | Design Review; Site | 1993 | ||
P. Seraya (Tankfarm 0) | Inspections; Government | ||||||
Approvals | |||||||
67. | 15,000m Storage Tank, | Ceylon | Ceylon | Design, Specifications | 1992 | ||
Kolonnawa, Sri Lanka | Petroleum Corp. | Petroleum Corp. | and Bill of Quantities | ||||
68. | Phase III Development to | Oiltanking | Oiltanking | Design Review; Site | 1992 | ||
Existing Oil Storage Terminal | Inspection; Government | ||||||
(Tankfarm 10 & ancillary works) | Approvals | ||||||
69. | Gasoline Tank (T-120) | Shell Eastern | Chiyoda | Design of Civil works; | 1991 | ||
Singapore | Review of Tank Design; | ||||||
Government Approvals | |||||||
70. | Upgrading to Lube Oil Blending | Esso S’pore | Esso S’pore | Full Consultancy | 1992 | ||
Facilities at Shipyard Road | |||||||
71. | ADO-Dehazing Unit | Esso S’pore | Esso S’pore | Full Consultancy except | 1991 | ||
Process Equipment Units | |||||||
72. | Bulk Storage Terminal | Oiltanking | Oiltanking | Civil Design; Review of | 1992 | ||
(Phase II) – Tankfarms | Tank Design; Construction | ||||||
for 14 tanks | Inspection; Government | ||||||
Approvals | |||||||
73. | Storage Tank 222 | Shell Eastern | Sempec | Civil works design | 1991 | ||
at P. Bukom | including design check | ||||||
74. | Storage Terminal at P. Seraya | Caltex (Asia) | Caltex (Asia) | Feasibility Study | 1990 | ||
75. | 8 Storage Tanks, Pit 14 | Tankstore | Tankstore | Civil works design; | 1992 | ||
at P. Busing | Design check on tanks | ||||||
Source: Shell Chemicals magazine Autumn/Winter 2009 during the Ethylene Cracker Complex ground breaking ceremony on 4 May 2010
Petrochemical Plant
Liquefied Ethylene storage tanks and spheres
Fixed roof tanks with fixed water spray protection and fixed foam extinguishing systems
Category : | Pharmaceutical Plants Project | ||||||
Project | Owner | Client | Services Provided | Year Completed | |||
1. | New cafeteria in Abbvie existing | Abbvie | Abbvie | Design review; Government | 2016 | ||
building | approvals & construction | ||||||
inspection | |||||||
2. | New wastewater treatment system | Alcon | Veolia Water | Design review; Government | 2016 | ||
to Alcon | Technologies | approvals & construction | |||||
inspection | |||||||
3. | Singapore Milling Facility | Pfizer | Amec Foster | Design review; Government | 2016 | ||
Wheeler | approvals & construction | ||||||
inspection | |||||||
4. | Alcon pharmaceutical | Alcon | Alcon | Design review; Government | 2010 | ||
manufacturing plant at Tuas South | approvals & construction | ||||||
Avenue 5 & 14 | inspection | ||||||
5. | Glycol Chiller A & A | Schering-Plough | Schering-Plough | Design review; Government | 2008 | ||
works at 50 Tuas West | approvals & construction | ||||||
Drive | inspection | ||||||
6. | GSK Heel Recovery | GSK | Jacobs | Design review; Government | 2007 | ||
Engineering | approvals & construction | ||||||
inspection | |||||||
7. | A & A to Existing PB3 Building | GSK | Jacobs | Design review; Government | 2008 | ||
Engineering | approvals & construction | ||||||
inspection | |||||||
8. | A & A to Approved Works | Novartis | Foster | Design; Government | 2007 | ||
Wheeler | Approvals; Construction | ||||||
Inspection | |||||||
9. | Design of Solvent Storage | Novartis | Sumitomo | Design & application of road | 2007 | ||
Building extension & application | opening works | ||||||
of road opening works at | |||||||
Novartis Plant | |||||||
10. | Hydrogenation Facility at | GSK | Jacobs | Design review; Government | 2007 | ||
no. 1 Pioneer Sector 1 | Engineering | approvals & construction | |||||
inspection / Clerk-of-works | |||||||
11. | Sucralose Facility at Jurong | Tate & Lyle | CH2M Hill | Permitting support | 2007 | ||
Island (Crystal Project) | |||||||
12. | Novartis NSPM Project | Novartis | Foster Wheeler | Design review; Government | 2007 | ||
approvals & construction | |||||||
inspection | |||||||
13. | Spent Firewater Containment | GSK | GSK | Design; Government | 2004 | ||
Project | Approvals; Construction | ||||||
Inspection | |||||||
Alcon16A